
Mines, factories, rental fleets and prime power for sites without a grid.
Indicative FOB price per unit, Shanghai or Qingdao, valid 30 days from the date shown. Final price depends on configuration, quantity and the date of order; your written quotation states the exact engine, alternator and controller models.
| Item | Standard offer |
|---|---|
| Rating | 1,000 kW / 1,250 kVA prime (about 1,100 kW standby), 400 V, 50 Hz |
| Engine | Yuchai YC6C1660 series, 1500 rpm |
| Alternator | Brushless, H-class insulation, IP23 |
| Controller | Digital controller, paralleling-ready option |
| Build | Open frame with radiator, base tank option; 40 ft container on request |
| Lead time | 4–6 weeks after deposit |
| Testing | Factory load test before shipment, report supplied; third-party inspection (BV, SGS) can be arranged |
| Warranty | 12 months or 1,000 running hours, whichever comes first |
| Payment | 30% deposit, 70% before shipment after you review the test evidence |